By KakiList Editorial Team·Updated April 2026·Editorial standards
Looking for a ev charger covering the East Singapore zone? KakiList lists 124 verified EV Charger providers serving the East zone — which includes Tampines, Bedok, Pasir Ris, Changi. These providers maintain an average Google rating of 4.2★. Work in the East zone typically involves 7kW wall-mounted chargers, cable routing across car parks, and dedicated circuit upgrades. Each provider on KakiList displays real Google reviews and a direct WhatsApp contact — no middleman fees, no lead-generation spam.
Prefer a provider based in a specific estate? Pick your area for a more local view:
Average rating: ★★★★☆ 4.2 across 25901 reviews
See all 124 EV Charger providers in Singapore →
Contact providers directly for pricing.
Prices are estimates and may vary based on scope, property type, and urgency. Get exact quotes by requesting free quotes.
The East Singapore zone on KakiList covers Tampines, Bedok, Pasir Ris, Changi. Most ev charger providers listed here can reach any of these estates within their usual service window, with travel fees waived or minimal for same-zone bookings.
If you need a rapid response or a provider with deep local knowledge, a specific estate page (linked below) is usually the right call. If you're flexible on timing or happy to compare a wider range of providers, the zone view shows everyone covering your area.
EV chargers draw continuous high loads (7-22kW) over long periods. Incorrect installation — wrong cable gauge, wrong RCBO type (must be Type B for DC residual currents from EV inverters), inadequate MCB sizing — creates fire risk. EMA regulation exists because home insurance rejects claims from unlicensed electrical work. No licence = you eat any damage.
Landed 7kW wallbox (with adequate existing DB): S\$1,800-3,800. 11kW three-phase: S\$2,800-5,800. 22kW fast AC: S\$4,500-9,000. Condo lot install (MCST-coordinated): S\$2,500-8,500. DB upgrade if capacity insufficient (common in older landed): +S\$2,500-6,500. HDB residents use LTA's Common Charger Grant network — private installs not permitted.
7kW single-phase: adequate overnight charging for most EVs (Tesla Model 3, Polestar 2, BYD Atto 3). 11kW three-phase: faster overnight charging, better for Taycans and larger-battery EVs. 22kW three-phase: fast home charging but needs sufficient supply capacity (often requires DB upgrade in older properties). Match capacity to actual usage — 7kW suffices for 90% of home charging scenarios.
This page lists 124 verified ev charger providers covering the East zone. Contact any of them via WhatsApp — they'll confirm availability and quote before scheduling.