By KakiList Editorial Team·Updated April 2026·Editorial standards
Looking for renovation near Tampines East MRT (DTL line)? This page lists KakiList-verified providers serving the Tampines area around the station, ranked by Google rating and review count. All listings are independent — no paid placements, no affiliate fees.
Tampines East sits on the DTL extension, a quieter residential pocket compared to the main Tampines interchange, surrounded by newer BTO clusters. renovation providers familiar with Our Tampines Hub and the Tampines St 41-48 blocks can reach your home in one trip without a detour.
The DTL connection makes Tampines East accessible for providers coming from other East-zone estates, which usually means faster response for one-off jobs and more flexible slot availability for recurring renovation work.
Most renovation jobs logged around Tampines East involve resale flat revivals, feature wall carpentry, and LED cove lighting installation.
Skip the research — get matched instantly
⚡ Get Free Renovation Quotes near Tampines East MRTAverage rating: ★★★★½ 4.7 across 39732 reviews
See all 211 Renovation providers in Singapore →
Tampines East sits on the DTL extension, a quieter residential pocket compared to the main Tampines interchange, surrounded by newer BTO clusters.
Our Tampines Hub, Tampines Eco Green, Tampines Polyclinic
Tampines St 41-48, Tampines Ave 7, Tampines Ave 9
DTL — Tampines, East Singapore
| Service | Estimated Cost |
|---|---|
| Toilet Renovation | S$5,000 – S$12,000 |
| Kitchen Renovation | S$8,000 – S$20,000 |
| 3-Room HDB Full Reno | S$25,000 – S$45,000 |
| 4-Room HDB Full Reno | S$30,000 – S$55,000 |
| 5-Room HDB Full Reno | S$35,000 – S$65,000 |
Prices are estimates for Tampines and may vary based on scope, property type, and urgency. Get exact quotes by requesting free quotes.
For HDB properties in Tampines, rates track the islandwide average for renovation. The main cost variables are job complexity and urgency, not location — though providers based outside the East zone may add a small transport fee.
For any HDB renovation, the contractor must be on HDB's Registered Renovation Contractors (RRC) list. This is enforced — homeowners using unregistered contractors face permit rejection and may have to undo work. Verify the RRC number on HDB's website before signing. For condo work, equivalent check is BCA registration.
HDB 4-room light package: S\$35,000-55,000. Mid-range (quartz counters, wardrobes, appliances): S\$55,000-85,000. High-end: S\$85,000-130,000. Condo 3-bedroom: S\$60,000-250,000+. Landed structural A&A: S\$350,000-900,000+. Budget 10-14 weeks from hacking to handover for HDB; 18-36+ months for landed A&A.
Staged: typically 10-20% on signing, 30% at hacking completion, 30% at carpentry/fit-out, 20% at handover. Any contractor demanding 50%+ upfront is the classic Singapore "disappearing contractor" pattern. Legitimate contractors manage cash flow through progress payments — large upfront demands are a red flag.
HDB permits (Certificate of Approval or COP) are needed for floor tile hacking, common wall work, window changes, and toilet modifications. A contractor saying "no need permit" is planning illegal work. For condo renovations, MCST approval, a security deposit (S\$1,000-3,000 refundable), and work hour restrictions apply — your contractor should handle coordination.
10-14 weeks is standard for a full 4-room HDB reno: 1-2 weeks hacking, 2-3 weeks masonry and carpentry, 3-4 weeks fit-out, 1-2 weeks finishing and handover. Contractors promising 6-week full renovations are either over-promising or cutting corners. Delays of 2-4 weeks are common due to material delivery, HDB inspections, and coordination issues.
Get matched with up to 5 verified providers serving the Tampines area. Free, no obligation.
⚡ Get Free Quotes Now