By KakiList Editorial Team·Updated April 2026·Editorial standards
Looking for a renovation covering the North Singapore zone? KakiList lists 211 verified Renovation providers serving the North zone — which includes Woodlands, Sembawang, Yishun. These providers maintain an average Google rating of 4.7★. Work in the North zone typically involves hacking and BTO makeover packages, electrical rewiring, and waterproofing rework. Each provider on KakiList displays real Google reviews and a direct WhatsApp contact — no middleman fees, no lead-generation spam.
Prefer a provider based in a specific estate? Pick your area for a more local view:
Average rating: ★★★★½ 4.7 across 39732 reviews
See all 211 Renovation providers in Singapore →
| Service | Estimated Cost |
|---|---|
| Toilet Renovation | S$5,000 – S$12,000 |
| Kitchen Renovation | S$8,000 – S$20,000 |
| 3-Room HDB Full Reno | S$25,000 – S$45,000 |
| 4-Room HDB Full Reno | S$30,000 – S$55,000 |
| 5-Room HDB Full Reno | S$35,000 – S$65,000 |
Prices are estimates and may vary based on scope, property type, and urgency. Get exact quotes by requesting free quotes.
The North Singapore zone on KakiList covers Woodlands, Sembawang, Yishun. Most renovation providers listed here can reach any of these estates within their usual service window, with travel fees waived or minimal for same-zone bookings.
If you need a rapid response or a provider with deep local knowledge, a specific estate page (linked below) is usually the right call. If you're flexible on timing or happy to compare a wider range of providers, the zone view shows everyone covering your area.
For any HDB renovation, the contractor must be on HDB's Registered Renovation Contractors (RRC) list. This is enforced — homeowners using unregistered contractors face permit rejection and may have to undo work. Verify the RRC number on HDB's website before signing. For condo work, equivalent check is BCA registration.
HDB 4-room light package: S\$35,000-55,000. Mid-range (quartz counters, wardrobes, appliances): S\$55,000-85,000. High-end: S\$85,000-130,000. Condo 3-bedroom: S\$60,000-250,000+. Landed structural A&A: S\$350,000-900,000+. Budget 10-14 weeks from hacking to handover for HDB; 18-36+ months for landed A&A.
Staged: typically 10-20% on signing, 30% at hacking completion, 30% at carpentry/fit-out, 20% at handover. Any contractor demanding 50%+ upfront is the classic Singapore "disappearing contractor" pattern. Legitimate contractors manage cash flow through progress payments — large upfront demands are a red flag.
This page lists 211 verified renovation providers covering the North zone. Contact any of them via WhatsApp — they'll confirm availability and quote before scheduling.